Weather permitting, plan on a trail work day at Stanky Creek on Saturday, April 28 at 8am.
I want to focus on the blue trail. Trail needs trimmed back the green is closing in, there are also a bunch of face slappers. In addition, shortly after the drop there are two bridges, a climb, a rotted out log pile and then you drop back down over a rooty section along the creek where you make a hard right to the short steep climb. Right there next to the creek, the trail is falling and a hole has approaching the trail, in addition, there is a hole starting to the right. Therefore, I propose rerouting the trail further away from the creek in this area. The next bridge needs reset.
Also, need to cut the tree that fell in the pit area and work on some draining and fixing some damage on the white trail.
Yellow trail - the boardwalk needs fixing and in the section opposite the boardwalk I would like to add addtional bridge there (the bridge that is no longer used at the end of the yellow, carry it back to this section).
For the pit area, I will cut it the week before the race so that it will not have a chance to grow back before the race.
I will bring a bunch of hand tools, weedeater, and a mower, and if I can get my saw to run a chainsaw (lesson learned, don't leave fuel in the tank without stabilizer). Bring whatever you got.