Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Registered users post planned trail work days here.

Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Postby Brad C » Fri Aug 15, 2014 4:06 pm

CALLING ALL TRAIL USERS: PLEASE BRING YOURSELVES AND BRING YOUR GLOVES. HELP GIVE BACK TO THE TRAILS WE ALL USE AND ENJOY!!!!!

Trail Work Day Saturday August 23rd @ 8am at Stanky Creek in Bartlett.

We will be moving Gravel to the trail, extending the railroad tie bypass, re-routing some trail that is eroding by the creek, adding a bridge and general cleanup of blue, some yellow and the connectors

Items we'll need.
Wheelbarrows are requested to help make the Gravel move down the trail faster.
Shovels, bow rakes, chain saw, wheel barrows, hammer, prybar, weed whacker, machete, Pulaski, Tamp, loppers, etc. Bring your tools you want to carry

Thanks
TBB / The Count

"In wine there is wisdom, in beer there is Freedom, in water there is bacteria.”
― Benjamin Franklin
User avatar
Brad C
Site Admin
 
Posts: 2417
Joined: Wed Apr 13, 2005 6:49 pm

Re: Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Postby Brad C » Sat Aug 23, 2014 3:37 pm

Great day at Stanky. 17 names on the sign in sheets plus I saw some people who were not signed in. Riders from several local teams were present, many are MSTA members, but we saw some new people too. Several projects were going on. The biggest is extending the causeway built by scouts on the connector to the creek crossing. Pictures as soon as I can get them posted. Thanks everyone.
TBB / The Count

"In wine there is wisdom, in beer there is Freedom, in water there is bacteria.”
― Benjamin Franklin
User avatar
Brad C
Site Admin
 
Posts: 2417
Joined: Wed Apr 13, 2005 6:49 pm

Re: Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Postby rich_k » Sun Aug 24, 2014 11:42 am

Great effort, everyone! Thanks a lot for your hard work!

Sorry I couldn't help; had to work.
rich_k
 
Posts: 580
Joined: Tue Jan 13, 2009 7:20 pm

Re: Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Postby Brad C » Sun Aug 24, 2014 1:28 pm

Pictures of the causeway extension. (causeway - a raised road or path, as across low or wet ground.)

Original causeway built as a Boy Scout project.
Image

Packing the gravel on the beginning of the extension.
Image

Laying out the route.
Image

Matt the supervisor.
Image

Blocks laid to allow water to flow through the causeway.
Image

Gravel gridlock while water flow blocks are laid.
Image

Blocks nearly complete.
Image

Continuing to fill, spread, and pack the gravel.
Image

Packing the gravel. In the background Morris makes stakes to secure the RR ties.
Image
TBB / The Count

"In wine there is wisdom, in beer there is Freedom, in water there is bacteria.”
― Benjamin Franklin
User avatar
Brad C
Site Admin
 
Posts: 2417
Joined: Wed Apr 13, 2005 6:49 pm

Re: Stanky Creek trail workday Sat. Aug. 23 8:00 AM

Postby Memphis_Buckeye » Sun Aug 24, 2014 8:48 pm

I was on the runners' sign in sheet :D
"You can't believe everything you read on the internet." ~Abraham Lincoln

"Death before DNF!" ~Me
User avatar
Memphis_Buckeye
 
Posts: 953
Joined: Sat Mar 07, 2009 7:07 pm
Location: Cordova, TN


Return to Trail Work Day

Who is online

Users browsing this forum: No registered users and 1 guest

cron